So after moving 50+ cubic yards of fill and topsoil, we finally have a flat backyard. All it needs is a last-minute final smoothing, and it will be ready for sod next week.
Why does the smoothing have to be last-minute, you ask? Well, we raked and we rollered, and we ended up with a nice smooth surface. And then we let Duncan loose on it. It's no longer smooth!
Little mud monster :)
ReplyDelete